500七台河油浸式变压器本体安装细则
安装在500七台河油浸式变压器本体上的dl/t5161.3-表1.0.3-1电器基础安装的工艺检验项目、性能、质量标准、检验方法和预埋件检查基础水平误差<5mmaccordingtodesignregulationsanddesigndrawingschecktrackspacingerror<5mmchecksealingperformancebeforepositioningwithrulercheckinflationtransportationgaspressure0.01Mpa~0.03MPacheckpressurewatchbandoiltransportationdoesnotleakoil,topcoverboltfasteningobservationcheckoilinsulationperformancestandardspecifiedvaluechecktestreportbodyinplacesleeveandclosedbuscenterlinearemainlyconsistentwithrulerortheodolitecheckrollerassemblyrollerinstallationcanflexiblyrotatepullcheckbrakeinstallationisfirm,detachablebuttressisfirmlyconnectedwithtransformerandembeddedpartsobservationcheckbodygroundingismainlyfirm,conductiongoodimpactvalueandfrequencycheckotheroiltanktoppositioningdevicenodeformationaccordingtomanufacturer'sspecifiedvaluecontrolmanufacturer'sregulation,nocrackobservationcheckqualityinspectionorganizationacceptanceopinionsignatureconstructionteamdate,date,date,date,date,date,date,date,date,date,date,date,date,date,date,date,supervision,date,date,date,date,date,date,date,date,date,
本文链接:http://www.xzsybyq.com/content/?4573.html